OpenUtilities Substation Help

Speed Sort Dialog

Lets the user assign Wire Termination preferences based on criteria.

Accessed when:

Drag and drop the column heading to place your most important criteria to the left. Drag and drop sub-branches within each branch so that your preferred types of lugs are at the top of the branches in the order that you want them assigned to connections. Dragging branches is done by selecting on a row with the mouse while pressing the <Shift> key.

Select the OK button. The preferences will be translated to Panduit types and be displayed in the order of preference in the Wire Terminations dialog.